Iron ore fixed plant shutdown
Planned a 14-day fixed plant shutdown with a fully resource-loaded P6 schedule, delivering full scope two days ahead of plan.
Result: Full scope delivered two days ahead of plan.
Read the full case studyA shutdown is won or lost before the plant stops. We build the scope, work packs and resource-loaded schedule that give your team a credible critical path and a safe, on-time restart, whether you need a planner for one outage or support across a campaign.
Who it is for: operators, EPC contractors and maintenance contractors running outages on fixed plant, LNG trains, processing facilities, ports and mobile fleet.
Agree and control the work list with operations and maintenance.
Build work packs and sequence activities against permits, resources and constraints.
Develop and review the resource-loaded schedule with your team.
Update progress, track the critical path and re-plan as emergent work appears.
Report performance against plan and capture lessons for the next outage.
Planned a 14-day fixed plant shutdown with a fully resource-loaded P6 schedule, delivering full scope two days ahead of plan.
Result: Full scope delivered two days ahead of plan.
Read the full case studyIntegrated engineering, construction and commissioning activities into a single schedule, supporting a safe, on-time restart.
Result: Safe, on-time restart.
Read the full case studyYes, on-site or remote, as an extension of your project team.
Oracle Primavera P6 and Microsoft Project.
Lump sum, time and materials, or retainer.
Yes: fixed plant and mobile fleet shutdowns, mine expansions, ports and rail across the Pilbara and wider WA.
Planning a shutdown or capital project? Tell us the scope and timeframe and we'll reply within one business day.
Request a planning call